Weyes
Contact Us
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-63323396 /0757-81002822/0757-81196681
  • Fax:0757-81196682
  • Contact:梁先生/Mr Leung
  • Phone:18900873268
  • E-mail:sbs@sbsprefabhouse.com
  • Skype: sbs-Candy ,sbs-Jessica
  • URL:http://www.nccbcrp.com/

Nigeria 4 storey office steel building

Nigeria 4 storey office steel building

Steel Structure 4 Floor Office In Nigeria

Steel Structure 4 Floor Office In Nigeria have special design.The whole frame use for the steel structure.The main frame use the H beam ,wall frame use the keel steel to do.About the floor use for the floor decking steel sheet ,included the stairs.The whole installation time just use the 2 months.
Design drawings

四层 设计图.jpg

Steel beam and steel column connection

Steel%20structure%20four-storey%20office%20building%20in%20Nigeria-3.jpga

steel frame picture

IMG_1750.jpg


Wall installation

4500_10329_ed597d32-1909-463c-ae74-553270ac15da.jpg

overall graph

QQ图片20160830085946_副本.jpg

Hits:4458 Time:[2019-6-28]

智慧彩票投注 北京28预测 荣鼎国际 秒速时时彩 上海11选5走势图 三分快3 秒速牛牛官网 黑龙江快乐十分 皇冠正版投注网 极速快乐8